Details

  • Client

    Nigeria Gas Company/Oando

    Project Scope

    The Major Scope of the Project consists of:

    • PlatformReengineering;
    • EPICOM of Compression System;
    • EPICOM of Gas Dew-pointing System;
    • EPICOM of Condensate Stabilization and Disposal System

    Challenges

    • Remote swamp location;
    • Processing of low pressure and high pressure gas streams;
    • High pressure discharge into the ELPS;
    • Reuse of existing platform constrained by limited extension possibilities;
    • Pile substructure redesign and strengthening.

    Location

    Warri, Delta State –Nigeria

    Completion Date

    2015 - Ongoing

    Man Hours

    300,000 man hours Estimated for completion



MAKARABA CENTRAL PROCESSING FACILITY

  • Central Gas Processing and Compresion Facility.

  • 150 mmscfd gathering and transmission system.

  •